ASTM A179 Tube 16mm Height AL1060 Embedded Finned Tube For Highly Corrosive Systems

产品详情
原产地:中国中国
品牌名称: TONG CHUANG品牌名称: TONG CHUANG
认证:ABS、GL、DNV、NK、PED、AD2000、GOST9941-81、CCS、ISO 9001-2008
型号: 16mm ASTM A179 嵌入式翅片管
付款和发货条款
最低订购量:100 公斤
价格面议
包装细节:木箱/铁箱/带塑料盖的捆包等。
交货时间:20-80
付款条件:信用证、电汇
供应能力:800 吨/月

SKU: 574 分类:
标准:ASTM A179管道材料:碳钢,不锈钢
颜色金属色鳍片材料带铝螺旋鳍片的碳钢管
Fin Pitch:2-14 毫米鳍片高度:最大 16 毫米
类型翅片管式换热管,不锈钢加热设备申请:加热器部件,制冷部件,热交换器,冷却器,流体冷却器
包装钢架,木制,铁制钢架木箱,箱内等
强光

Fin Tube Heat Exchanger Tube

16mm Embedded Finned Tube

Fin Tube ASTM A179

ASTM A179 Tube 16mm Height AL1060 Fin Embedded Finned Tube for Highly Corrosive Systems 
 
ASTM A179 Seamless Steel Tubes are supplied and produced by cold drawing method. The chemical composition includes carbon, manganese, phosphorus and sulfur.
SA179 steel tubes contain the corresponding measurements: ASTM A179/ASME SA179 Seamless Steel Tubes – hot rolled or cold drawn in sequence, with outside diameters from 1/4" NB to 2" NB (nominal bore), thicknesses from 1 mm to 8 mm separating thicknesses, lengths of 5800 mm/6000 mm/6096 mm/7315 mm/11800 mm, etc., and maximum lengths of 27000 mm with plain/beveled ends/fittings. 27000 mm with plain/beveled ends/fittings.A179 Seamless Cold Drawn Mild Steel Heat Exchanger and Condenser Tubes are certified and tested for impact test, heat treatment, hardness test, flattening test, reverse flattening test, flanging test, hydrostatic pressure test.


TUBES SPECIFICATIONS
 

标准ASTM、ASME 和 API
尺寸1/2" NB 至 36" NB
厚度3-12 毫米
时间表SCH 40, SCH 80, SCH 160, SCH XS, SCH XXS, 所有规格
宽容冷拔管:+/-0.1mm 冷轧管:+/-0.05毫米
工艺冷轧和冷拔
类型无缝 / ERW / 焊接 / 加工
形式圆管/钢管,方管/钢管,矩形管/钢管,卷管,"U "形管,盘饼卷管,液压钢管
长度最小 3 米,最大 18 米,或根据客户要求
结束平端,斜端,花纹

化学成分 (%) 最大值
 

CP≤S≤Si≤
0.06-0.180.27-0.630.0350.0350.25

机械性能
 

拉伸强度(兆帕)屈服强度(兆帕)伸长率(%)硬度(HRB)
325 分钟180 分钟35 分钟最大 72

G Type Embedded Spiral Finned Tube
 
G-type embedded spiral finned tube is made by machining a steel strip of a certain width and depth of spiral groove on the steel pipe, and then the steel strip is set on the steel pipe by equipment. During the winding process, the steel band will be firmly wound in the spiral groove because the preload force reaches a certain level to ensure a certain contact area between the steel band and the steel tube. In order to prevent the steel belt spring from falling off from the optical tube, both ends of the steel belt need to be welded to the steel tube. In order to facilitate the setting, there should be a certain gap between the steel belt and the spiral groove. If the gap is too small, the commissioning process will be difficult to proceed smoothly.
In addition, there will always be a certain amount of springback in the wound steel strip, which prevents a good bond between the strip and the bottom of the spiral groove. Inlaying fins can be done on general equipment and at a very low cost. Our company adopts advanced production equipment in McElroy Company in the U.S.A. The advanced technology of slotting and pre-embedding, good self-stabilization, firm pre-embedding, pull-off force of not less than 70n, and the permissible temperature of up to 400℃, with strong resistance to temperature and thermal shock, are widely used in petrochemical air coolers.


应用
 

  • 制药设备
  • 化学设备
  • 海水设备
  • 热交换器
  • 冷凝器
  • 纸浆和造纸工业
  • 近海石油钻探公司
  • 发电
  • 石油化工
  • 气体处理
  • 特种化学品

如需快速报价,请提供以下要求
 

件数,

基管:直径、厚度、长度和材料规格。

翅片:材料规格、类型(实心或锯齿形)、高度、厚度、间距、翅片长度和无翅片部分。如有需要,请提供焊接预处理细节。

所需的交货期。

Payment term.